John Barovetto Park (Mace Ranch Neighborhood Park)
CIP8136 - John Barovetto Park (Mace Ranch Neighborhood Park)
| Location: | 4400 Alhambra Drive (at Arroyo Ave.) |
|
| Status: | Archived | |
| Type: | Facilities | |
| Approved Budget: | $1.0 mil | |
| Project Manager: | Terry Jue : tjue@ci.davis.ca.us | |
| Design Consultant: | Royston Hanamoto Alley and Abey (RHAA) | |
| Construction Contractor: | Hemington Landscape Services | |
| Description: | Project Complete. The park is designed to meet the needs of the neighborhood and includes playgrounds, picnic facilities, natural/landscaped areas and multi-use open fields. | |
| Additional Info: | ||
| Last Update: | Monday Jul. 7, 2008 |
Project Details
- Updates
-
Project Status
- Thursday June 7, 2007
Project was completed in early May and the Grand Opening Celebration was held on May 24, 2007. See picture section for images of the completed park and opening festivities. - Monday March 5, 2007
PLEASE NOTE: The park is not yet open to the public. Please visit this page or the city's front page for information on the Grand Opening event (anticipated in May). Hemington completed all major improvements to the park in January and a 90-day plant establishment period was started. After the establishment period ends and the city accepts the project as complete, the park will be ready for use by the public. - Tuesday October 17, 2006
Hemington has performed grading of the site, installed underground utilities, and trenched for irrigation lines. Surface improvements for the central area are taking shape. See new photos in pictures folder. - Thursday July 20, 2006
Construction start of July 19, 2006 issued to Hemington Landscape Services. The grading contractor, AJ Dirtmovers, will begin work with mowing and discing the site prior to performing rough grading. The site will be fenced for security and safety and will require closure of the onsite bikepath for the duration of the project. Appropriate construction and detour signs will be posted. The bikepath is anticipated to be closed starting the week of July 24. - Tuesday June 6, 2006
The bid opening on 5/25 resulted in five bids. A contract award to Hemington Landscape Services from Cameron Park will be presented to Council for approval on 6/13. Construction is anticipated to occur from July to December. - Monday March 20, 2006
RHAA has delivered the 100% submittal on the plans and specs. After review by staff, the plans will be finalized and presented to the City Council for approval and authorization to bid the project in April/May. - Wednesday February 8, 2006
In December, the Neighborhood Park Planning Committee selected play equipment from LSI and Kompan for the tot-lot and school-age play areas. Please see the attachments tab to view exhibits of the play equipment. RHAA has also recently submitted 90% plans for review by city staff. - Friday December 9, 2005
On 9/13, the Council approved the Mace Ranch Park Master Plan as recommended by the Recreation and Parks Commission. The Council also approved on 10/4 an amendment to RHAA's consultant agreement to prepare design and construction documents. RHAA has submitted 60% design documents for review. The next community workshop will focus on Play Equipment Designs for the Mace Ranch Neighborhood Park. Play equipment representatives will present a variety of play structure designs for review and selection. This Public Park Committee Meeting will be held on Friday, December 16, from 6-9 p.m. at the Davis Police Department Conference Room, 2600 Fifth Street. Please contact Anne Brunette at 530-757-5626 for more information. - Monday May 16, 2005
Participants in the first community workshop, held on April 5, helped develop three different design scenarios for the park. The next Public Park Design Workshop will be held on Tuesday, May 17, 7-9 p.m., in the VMC Center Club Room. RHAA will provide updated design concepts, product boards, and additional information for review and feedback by the community. - Wednesday March 30, 2005
The city has selected Royston Hanamoto Alley and Abey (RHAA) as the landscape architect for the park. The first Public Park Design Workshop will be held on April 5. RHAA will provide site plans and design tools to solicit neighborhood input on the project. - Tuesday December 7, 2004
RFP responses are due by 5:00 p.m. on December 20, 2004.
- Thursday June 7, 2007
- Project Objectives
-
Project Objectives
- No project objectives listed
- Pictures
-
Project Photos
-
Click for larger image
Landscape architecture class from UCB visiting the construction site. -
Click for larger image
Fabricated rock climbing feature for the playground. -
Click for larger image
Boundary curbs constructed for the play areas. -
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
Looking west at the access ramp into the tot-lot play area. -
Click for larger image
Looking east down the walking path on the north edge of the site. Note trenching for irrigation lines. -
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
Click for larger image
-
- Attachments
-
Project Attachments
- RFP letter
Letter outlining RFP process.
- Exhibit B - Aerial
Aerial map of park location and surrounding improvements.
- Consultant Agreement
City of Davis' Standard Consultant Agreement
- Exhibit A - Site Map
Map showing location of proposed Mace Ranch Neighborhood Park.
- Tot-lot
The tot-age play area includes a main play structure, activity wall, and two tot swings. A sand play area and spring-bouncing structure are also included in the tot-lot but are not shown.
- School age
The school-age play area features a large play-activity structure with numerous features including a rock boulder, rock climbing wall, slide and more. Not shown is a balance-spinning structure.
- Final Design
Here is the final design layout of the Mace Ranch Neighborhood Park. Please note the picnic area (7) will be shaded with a kite structure and not trees as shown.
- Update Letter - July 14, 2006
Project update letter sent to neighborhood residents.
- RFP letter