Manor Pool Complex Rehabilitation
CIP8796 - Manor Pool Complex Rehabilitation
| Location: | 2850 Temple Drive |
|
| Status: | Archived | |
| Type: | Facilities | |
| Approved Budget: | $736,000 | |
| Project Manager: | Michael Mitchell, Senior Civil Engineer : mmitchell@ci.davis.us.ca | |
| Design Consultant: | Jones & Madhavan | |
| Construction Contractor: | Waters Contracting | |
| Description: | Anticipated rehabilitation work in this project includes: Separate pumping, filtering, heating, and chemical dosing systems for each of the four pools, including plumbing and related equipment; Upgrades due to regulatory changes in the last 25 years (building, electrical, mechanical, health, safety, environmental, etc.); Replacing the failing, existing wood mechanical building with masonry block. (Note: This building has significant Code deficiencies and must be replaced); Repairing the pool tiling, drains and related deck work; Repairing the security fence around complex; Replacing the aging diving platforms; and Upgrading the pool lighting. | |
| Additional Info: | Two times this project was advertised, which resulted in bids far over the budget. The funds in this CIP will now be available for Parks Department to repair/replace the existing facilities on an as-needed basis. 2005: This project was re-budgeted. A new consultant, Jones & Madhavan, was hired to perform the design. | |
| Last Update: | Wednesday Apr. 8, 2009 |
Project Details
- Updates
-
Project Status
- Monday April 21, 2008
After many months of anticipation and excitement, the Manor Pool Grand Opening is scheduled for Saturday, May 31st. - Thursday November 1, 2007
Construction continues at the Manor Pool site. - Wednesday June 13, 2007
Construction work on the Manor Pool Complex Rehabilitation Project has begun. Currently, portions of the complex are being demolished to prepare for the renovation. Images of the work can be viewed under the heading of Pictures. - Thursday May 31, 2007
The city of Davis has entered into a contract with Waters Contracting for the renovation of the 34 year-old Manor Pool Complex. The complex will undergo a complete makeover to address a leak in the dive pool, replace old electrical and mechanical systems and facility structures, bring the complex up to current health and safety codes and ADA accessibility requirements, and to modernize the complex to better meet the needs of the users. The upcoming modifications will include replacing two of the smaller pools--the baby and octangular pools--with a new, zero-depth “beach” entry pool and a new, separate interactive water play area. A single-loop waterslide will replace the old slide at the competition pool and the aging diving platforms will be replaced at the dive pool. New turf and irrigation will be installed, and the decking will be replaced to comply with current ADA accessibility requirements and to eliminate slip hazards. The bath house and changing area will be rehabilitated and include adding a roof and installing new shower and changing rooms. And, a new snack bar is being added to better serve the pool users. Now that the contract has been signed, the project is expected to begin within the next month, with an anticipated completion date of May 1, 2008. Although the pool, parking lot and restrooms will be closed during the construction period, the park will remain open. Portable restrooms will be provided in the park during construction, and recreation camps will still occur during the summer with driver drop off occurring adjacent to the park on Tulip Lane. During this summer, city staff has adjusted programming at both Community & Arroyo Pools to accommodate the summer demand for aquatics programming. Information about the renovation can be found on the City’s website at http://www.cityofdavis.org/pw/CIP/, and the following city staff can assist with answering questions during the project: Connie Foppiano 530-757-5626 Recreation programs, Michael Mitchell 530-757-5681 Construction/Contractor, Jim Newman 530-757-5656 Slide Hill Park, Anne Brunette 530-757-5626 Neighborhood issues City staff anticipates the reopening of Manor Pool in 2008 to exceed the public’s expectations and to be a community asset that will benefit the residents for years to come. Look for announcements on Manor’s Grand Re-Opening in May 2008-- we’ll look forward to welcoming the community to the “new” Manor Pool!
- Monday April 21, 2008
- Project Objectives
-
Project Objectives
- No project objectives listed
- Pictures
-
Project Photos
-
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Poor conditions at Manor Pool Complex prior to renovation/rehabilitation -
Click for larger image
Overhead view of Manor Park and the Manor Pool complex. -
Click for larger image
New slide at the competition pool -
Click for larger image
Construction of the zero-depth “beach” entry pool -
Click for larger image
Demolition work at the Manor Pool Complex in preparation for the renovation. -
Click for larger image
Demolition work at the Manor Pool Complex in preparation for the renovation. -
Click for larger image
Demolition work at the Manor Pool Complex in preparation for the renovation. -
Click for larger image
Demolition work at the Manor Pool Complex in preparation for the renovation. -
Click for larger image
Demolition work at the Manor Pool Complex in preparation for the renovation.
-
- Attachments
-
Project Attachments
- Update 5/30/07
Manor Pool Renovation Update - Press Release / Letter to Neighbors - 5/30/07
- Site Plan
Site Plan for the Manor Pool Rehabilitation Project
- Update 5/30/07